Brad's Car Manuals: A 3rd party mirror of CHARM + LEMON car manuals
Home >> Chevrolet >> 2000 >> Impala Base, 3.4 E >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Download the full database via torrent (~1.1 TB)  |  Download Brad's custom LEMON patches
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
3.4L Eng, Both Heads12.8A
Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble:
Includes: Clean and replace necessary components only.
Both0.6B
One0.3B
Combination Procedure: ROCKER ARM STUD: Remove & Replace:
Each Additional0.2B
One0.3B
Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct:
Per 3 Springs0.2A