Brad's Car Manuals: A 3rd party mirror of CHARM + LEMON car manuals
Home >> Chrysler >> 2005 >> Crossfire Base, 2D Convertible >> Repair and Diagnosis >> Engine Performance >> System >> Emissions Control System >> Air Injection >> Switchover Solenoid >> Installation

Switchover Solenoid: Installation

Download the full database via torrent (~1.1 TB)
Fig 1: Locating Solenoid Locking Tab, Bracket & Solenoid
GC0033626Courtesy of DAIMLERCHRYSLER CORP.
  1. Position the air pump switchover solenoid (2) above air pump switchover solenoid mounting bracket (3) and lower until air pump switchover solenoid locking tab (1) snaps into place.
    Fig 2: Locating Vacuum Lines & Harness Connector
    GC0033625Courtesy of DAIMLERCHRYSLER CORP.
  2. Connect the vacuum lines (1).
  3. Connect the air pump switchover solenoid harness connector (2).
  4. Install the air cleaner housing.
  5. Connect the negative battery cable.