Brad's Car Manuals: A 3rd party mirror of CHARM + LEMON car manuals
Home >> Eagle >> 1990 >> Summit Base, Automatic >> Labor Times >> Engine Mechanical >> Mechanical >> Valve >> Grind Complete

Grind Complete

Download the full database via torrent (~1.1 TB)
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
1.5L Eng,8 Valve Eng5.9A
Additional Procedure: VALVE: Grind Complete:
Where Air Cond interferes add0.20.2A
Where Pwr Strg interferes add0.20.2A
Combination Procedure: ROCKER ARM ASSEMBLY: Disassemble & Assemble:
Includes: Clean and replace necessary components only.
In-Line40.4B
Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct:
Per 3 Springs0.2A