Brad's Car Manuals: A 3rd party mirror of CHARM + LEMON car manuals
Home >> Isuzu >> 1990 >> Impulse Automatic >> Repair and Diagnosis >> Engine Performance >> Remove, Overhaul & Install >> Engine Controls - Remove/Install/Overhaul >> Ignition System >> Distributor >> Reassembly (2.3L)

Reassembly (2.3L)

Download the full database via torrent (~1.1 TB)  |  Download Brad's custom LEMON patches
  1. Attach advance springs to distributor shaft spring hanger pin. Ensure smaller tapered ends of spring (both ends) are secured to lower side of hook.
  2. Align rotor shaft notches with distributor shaft notches. Install pinion gear and washers. Insert roll pin. Stake both sides of roll pin. Align scribe marks on breaker plate and distributor housing.
  3. Install reluctor. Ensure reluctor roll pin notch and reluctor notch are parallel when roll pin is inserted into reluctor. Install vacuum advance unit. Apply vacuum to advance unit and ensure vacuum advance moves.
Fig 1: Exploded View of Distributor (2.3L)
G122435Courtesy of ISUZU MOTOR CO.