Brad's Car Manuals: A 3rd party mirror of CHARM + LEMON car manuals
Home >> Kia >> 2003 >> Sedona EX >> Repair and Diagnosis >> Electrical >> Charging Systems >> System Testing >> Load Test

Load Test

Download the full database via torrent (~1.1 TB)  |  Download Brad's custom LEMON patches
  1. When discharging the battery during 15 seconds at half currency of Cold Cranking Power (CCP), the voltage of the battery should be as shown below.
    Fig 1: Load Test Specifications
    G00312691Courtesy of KIA MOTORS AMERICA, INC.
  2. When the voltage is not within specification, repeat the load test again, and recharge.
  3. If the battery is left alone for 2 hours after recharging and its output is over 12.5V, and the voltage after a load test is over the standard value, the battery can be used.