Brad's Car Manuals: A 3rd party mirror of CHARM + LEMON car manuals
Home >> Mazda >> 2002 >> MPV ES >> Repair and Diagnosis >> Electrical >> Starter >> Starting System >> Component Tests >> Magnetic Switch Operation Inspection >> Pull-Out Test

Pull-Out Test

Download the full database via torrent (~1.1 TB)  |  Download Brad's custom LEMON patches

Verify that the drive pinion is pulled out with battery positive voltage connected to terminal (S) and the started body grounded. See Fig 1 . If not pulled out, repair or replace the starter.

Fig 1: Performing Pull-Out Test
G00356713Courtesy of MAZDA MOTORS CORP.