Brad's Car Manuals: A 3rd party mirror of CHARM + LEMON car manuals
Home >> Nissan-Datsun >> 2012 >> NV3500 HD SL >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System - Introduction (VK56DE) >> Basic Inspection >> Additional Service When Replacing ECM >> Work Procedure

Work Procedure

Download the full database via torrent (~1.1 TB)  |  Download Brad's custom LEMON patches
  1. PERFORM INITIALIZATION OF NVIS (NATS) SYSTEM AND REGISTRATION OF ALL NVIS (NATS) IGNITION KEY IDS

    Refer to "ECM RE-COMMUNICATING FUNCTION: SPECIAL REPAIR REQUIREMENT ".

    GO TO 2.

  2. PERFORM VIN REGISTRATION

    Refer to "WORK PROCEDURE ".

    GO TO 3.

  3. PERFORM ACCELERATOR PEDAL RELEASED POSITION LEARNING

    Refer to "WORK PROCEDURE ".

    GO TO 4.

  4. PERFORM THROTTLE VALVE CLOSED POSITION LEARNING

    Refer to "WORK PROCEDURE ".

    GO TO 5.

  5. PERFORM IDLE AIR VOLUME LEARNING

    Refer to "WORK PROCEDURE ".

    END