Brad's Car Manuals: A 3rd party mirror of CHARM + LEMON car manuals
Home >> Nissan-Datsun >> 2012 >> Quest LE >> Repair and Diagnosis >> Engine Performance >> Testing & Diagnosis >> Engine Control System - Component Testing >> Periodic Maintenance >> Ignition Timing >> Work Procedure

Work Procedure

Download the full database via torrent (~1.1 TB)  |  Download Brad's custom LEMON patches
  1. CHECK IGNITION TIMING
    1. Attach timing light to loop wires as shown in the figure below.
      • Timing light (A)
      • <==: Vehicle front
        Fig 1: Identifying Timing Light
        G08171606Courtesy of NISSAN NORTH AMERICA, INC.
    2. Check ignition timing.

      : INSPECTION END

      Fig 2: Identifying Timing Indicator
      G08171607Courtesy of NISSAN NORTH AMERICA, INC.